Send Message
Home ProductsPassenger Elevator

1600kg 10 Persons Passenger Lift Elevator For Construction Building

Certification
China SHANGHAI SUNNY ELEVATOR CO.,LTD certification
China SHANGHAI SUNNY ELEVATOR CO.,LTD certification
With the arrival of the new year, I wish the company will expand its scale, develop its business, develop its business and expand its financial resources.

—— Melya

Insisting on Product Quality Management, Building Long-term Effective Mechanism of Quality. It's a pleasure to cooperate with you.

—— Yuilly

I'm Online Chat Now

1600kg 10 Persons Passenger Lift Elevator For Construction Building

1600kg 10 Persons Passenger Lift Elevator For Construction Building
1600kg 10 Persons Passenger Lift Elevator For Construction Building

Large Image :  1600kg 10 Persons Passenger Lift Elevator For Construction Building

Product Details:
Place of Origin: China
Brand Name: SUNNY
Certification: 3C,CE
Model Number: Passenger elevator
Payment & Shipping Terms:
Minimum Order Quantity: 1 set
Price: $7000~12000
Packaging Details: container
Delivery Time: 15~30 days
Payment Terms: L/C, T/T, Western Union
Supply Ability: 500 Set/ Year
Detailed Product Description
Name: Passenger Lift Elevator Load: 630-1600kg
Speed: 1.0~2.5m/S Warranty: 1 Year
Material: Stainless Steel 304 Usage: Passenger Lift Elevator
Control System: VVVF Elevator Control System Keywords: Passenger Lift Elevator
Drive System: AC Or DC Machine Room: Machine-room Or Machine-roomless
Model: Passenger Lift Elevator Type: Passenger Lift Elevator
High Light:

small passenger lift

,

high speed elevator

630-1600kg 10 Persons Personalization Design Passenger Elevator For Construction Building

1600kg 10 Persons Passenger Lift Elevator For Construction Building

 

Our advantages:

1. Help Customers Source in China to reduce their cost
· To provide customers with whole purchasing plan of elevator parts;
·To find out the best conjunction point between quality and price in order to reduce costs for them.

2. How to develop the suppliers for customers
·To get customers’ need through communicating.
·To find out three to four manufactures of the corresponding parts according to the request of the customers.

3. Customers: Ask price and get samples from the manufactures
·To visit the factory (acknowledge the production ability and quality control process).
·Basing on the price, sample and visiting, recommend manufacturers to our customers.

4. How to help customers order from the qualified suppliers
·Follow the process of the order.
·Send QC to inspect on site before shipping to acknowledge the product quality.
·Transfer the response from the customers to the suppliers on time, and follow up the improvement.

 

Specifications Load(kg) Speed(m/s)

Size of entra

nce(mm)

Size

of car(mm)

Size of hoist

way(mm)

Size of machine room

(mm)

Overhead heig

ht(mm)

Pit de

pth(mm)

Max travelling heig

ht(m)

630-1.0 630 1.0

800*

2100

1400*

1100*2300

1900*

1750

1900*1750 3900 1300 50
630-1.6 1.6 4050 1400 60
630-1.75 1.75 4100 1400 90
800-1.0 800 1.0

1400*

1350*2400

1900*

2000

1900*2000 4000 1300 50
800-1.6 1.6 4150 1350 60
800-1.75 1.75 4200 1400 90
800-2.0 2.0

1950*

2000

1950*2000 4400 1450 105
800-2.5 2.5 5000 1800 150
1000-1.0 1000 1.0

900

*2100

1600

*1400*2400

2100*

2050

2100*2050 4000 1300 50
1000-1.6 1.6 4150 1350 60
1000-1.75 1.75 4200 1400 90
1000-2.0 2.0

2150*

2050

2150*2050 4400 1450 105
1000-2.5 2.5 5000 1800 150
1250-1.0 1250 1.0

1100*

2100

1950*

1400*2400

2550*

2050

2550*2050 4600 1600 50
1250-1.6 1.6 4650 1650 80
1250-1.75 1.75 4700 1700 120
1250-2.0 2.0 4800 1750 120
1250-2.5 2.5 5100 2200 150
1350-1.0 1350 1.0

1950*

1500*2400

2550*2150 2550*2150 4600 1600 50
1350-1.6 1.6 4650 1650 80
1350-1.75 1.75 4700 1700 120
1350-2.0 2.0 4800 1750 120
1350-2.5 2.5 5100 2200 150
1600-1.0 1600 1.0

1950*

1750*2400

2550*

2400

2550*

2400

4600 1600 50
1600-1.6 1.6 4650 1650 80
1600-1.75 1.75 4700 1700 120
1600-2.0 2.0 4800 1750 120

 

1600kg 10 Persons Passenger Lift Elevator For Construction Building 0

 

FAQ
1. Are the elevator wire ropes durable?
The elevator wire rope has special provisions and requirements. Configuration is not only for wire rope and rated load, but also considered the size of the traction, as a result, the tensile strength of wire rope is greater than the weight of the lift. The safety factor is equipped with more than four wire rope. So it won’t break at the same time.
2. Is it dangerous for power failure suddenly during the elevator running?
If it occurs, the elevator will automatically stop due to the electrical and mechanical safety device. In case of power failure,elevator brakes will automatically taken. In addition, the power supply departments such as planned outage, prior notice are also operating.
3. Will us be hurt when it closed suddenly?
In the closing process, if people touch the hall door, the door of elevator will automatically restart without any danger. With anti clamping switch, once the gate touched, this switching action make the elevator unable to be closed and even reopened. In addition, closing force is also available here.
4. How the elevator running?
Elevators are operated with a counterweight wire rope through the (tractor) traction drive, making ups and downs on the guide rail.
5. Is the escalator installation complicated?
We believe the functions of an escalator are not necessarily proportional to the operation complexity. Therefore, escalators designed by us apply an integrated structure, so that the equipment is more precise and more efficient and allows easier and more convenient commissioning.
6. Do you have any cerifications?
Yes, we do with ISO9001 / CCC / CE Certificates for u.

Contact Details
SHANGHAI SUNNY ELEVATOR CO.,LTD

Contact Person: Mr. Wei CHEN

Tel: +86-13661864321

Send your inquiry directly to us (0 / 3000)