Send Message
Home ProductsPanoramic Elevator

1.75m/S Sunny High Speed Elevator Panoramic Lift For Office Hotel Villa

Certification
China SHANGHAI SUNNY ELEVATOR CO.,LTD certification
China SHANGHAI SUNNY ELEVATOR CO.,LTD certification
With the arrival of the new year, I wish the company will expand its scale, develop its business, develop its business and expand its financial resources.

—— Melya

Insisting on Product Quality Management, Building Long-term Effective Mechanism of Quality. It's a pleasure to cooperate with you.

—— Yuilly

I'm Online Chat Now

1.75m/S Sunny High Speed Elevator Panoramic Lift For Office Hotel Villa

1.75m/S Sunny High Speed Elevator Panoramic Lift For Office Hotel Villa
1.75m/S Sunny High Speed Elevator Panoramic Lift For Office Hotel Villa 1.75m/S Sunny High Speed Elevator Panoramic Lift For Office Hotel Villa

Large Image :  1.75m/S Sunny High Speed Elevator Panoramic Lift For Office Hotel Villa

Product Details:
Place of Origin: China
Brand Name: SUNNY
Certification: CE,ISO9001
Model Number: Panoramic Lift
Payment & Shipping Terms:
Minimum Order Quantity: 1 set
Price: $7000~12000
Packaging Details: container
Delivery Time: 15~30 days
Payment Terms: L/C, T/T, Western Union
Supply Ability: 500 Set/ Year
Detailed Product Description
Name: Panoramic Lift Load: 630-1350kg
People: 8-18 Speed: 1.0-1.75m/S
Application: Apartment, Shopping Malls, Office, Hotel, Villa, A Traction Ratio: 2:1
Material: Stainless Steel Traction Machine: Gearless Traction Machine
Model: Panoramic Lift Type: Panoramic Lift
High Light:

panoramic glass elevator

,

observation elevator

Panoramic Office Hotel Villa High Speed Elevator Load 630-1600kg / Speed 1.0-1.75m / S

1.75m/S Sunny High Speed Elevator Panoramic Lift For Office Hotel Villa

 

1. Excellent exterior design, suitable for different building design, such as office building, shopping center, luxury hotel and so on.
2. Adopting SPM traction machine, micro-computer control, VVVF integrated control system, small machine room and machine roomless design, eco-efficiency.


Small room flat panoramic technical parameters

Load

(kg)

Person Speed

Car size

(mm)

Door open(mm) Shaft size(mm) OH(mm) PD(mm) Power(kw)
630 8 1.0/1.5/1.6/1.75 1400*1100*2440 800*2100 2400*1600 4400/4500/4500/4600 1500/1600/1600/1700 4.1/7.2/7.2/7.2
800 10 1.0/1.5/1.6/1.75 1400*1350*2440 800*2100 2300*1850 4400/4500/4500/4600 1500/1600/1600/1700 5/9/9/9
1000 13 1.0/1.5/1.6/1.75 1600*1400*2440 900*2100 2500*1900 4400/4500/4500/4600 1500/1600/1600/1700 6/11.7/11.7/11.7
1150 15 1.0/1.5/1.6/1.75 1700*1500*2440 1000*2100 2600*2000 4400/4500/4500/4600 1500/1600/1600/1700 7.4/13/13/13
1250 16 1.0/1.5/1.6/1.75 1700*1600*2440 1000*2100 2600*2100 4400/4500/4500/4600 1500/1600/1600/1700 8.2/14.3/14.3/14.3
1350 18 1.0/1.5/1.6/1.75 1800*1600*2440 1000*2100 2700*2100 4400/4500/4500/4600 1500/1600/1600/1700 8.2/15.4/15.4/15.4

 

1.75m/S Sunny High Speed Elevator Panoramic Lift For Office Hotel Villa 0

 

1.75m/S Sunny High Speed Elevator Panoramic Lift For Office Hotel Villa 1

 

FAQ
1. Are the elevator wire ropes durable?
The elevator wire rope has special provisions and requirements. Configuration is not only for wire rope and rated load, but also considered the size of the traction, as a result, the tensile strength of wire rope is greater than the weight of the lift. The safety factor is equipped with more than four wire rope. So it won’t break at the same time.
2. Is it dangerous for power failure suddenly during the elevator running?
If it occurs, the elevator will automatically stop due to the electrical and mechanical safety device. In case of power failure,elevator brakes will automatically taken. In addition, the power supply departments such as planned outage, prior notice are also operating.
3. Will us be hurt when it closed suddenly?
In the closing process, if people touch the hall door, the door of elevator will automatically restart without any danger. With anti clamping switch, once the gate touched, this switching action make the elevator unable to be closed and even reopened. In addition, closing force is also available here.
4. How the elevator running?
Elevators are operated with a counterweight wire rope through the (tractor) traction drive, making ups and downs on the guide rail.
5. Is the escalator installation complicated?
We believe the functions of an escalator are not necessarily proportional to the operation complexity. Therefore, escalators designed by us apply an integrated structure, so that the equipment is more precise and more efficient and allows easier and more convenient commissioning.
6. Do you have any cerifications?
Yes, we do with ISO9001 / CCC / CE Certificates for u.

Contact Details
SHANGHAI SUNNY ELEVATOR CO.,LTD

Contact Person: Mr. Wei CHEN

Tel: +86-13661864321

Send your inquiry directly to us (0 / 3000)